House2025-26 sessionFiscal note

ESHB 1819 — Increasing transmission capacity.

Did not pass — the 2025–26 session has ended

Sponsor
Barnard
Introduced
February 18, 2025
Status
H Rules X
Last action
House Rules "X" file. (February 19, 2026)

What this bill does

Requires electric utilities with more than 25,000 customers that operate transmission lines to examine which of the lines can be reconductored in their Integrated Resource Plans. Authorizes the Utilities and Transportation Commission (UTC) to allow an incentive rate of return on electric utility investments in reconductoring and to adopt additional incentives to increase existing transmission capacity. Categorically exempts reconductoring projects from the State Environmental Policy Act that are located within existing rights of way or that widen existing rights of way if the widening remains within previously disturbed or developed lands and extends only as far as is needed to comply with electrical standards.

From the Washington State Legislature's nonpartisan staff bill analysis. Read the full analysis ↗

Floor votes

  • House — 3rd Reading & Final Passage · March 12, 2025
    97 yea · 0 nay · 1 not voting

Track ESHB 1819 on OlympiaTrack

A free account adds a plain-English AI summary, the full hearing and amendment record, who testified, and roll calls by member. Track the subject and get an alert if it comes back next session.

Create a free account

Other bills sponsored by Barnard

All 2025-26 Washington State bills →

Source: the Washington State Legislature. OlympiaTrack is an independent bill-tracking service and is not affiliated with the Legislature. View on leg.wa.gov ↗